Environmental Engineering — Formula Sheet | EngineeringHulk


Environmental Engineering — Formula Sheet

Every key formula from Civil_61 to Civil_68 — organised by topic for rapid GATE CE revision with IS code references and standard design values

Last Updated: April 2026

How to Use This Sheet

  • This sheet covers all 8 topic pages of the Environmental Engineering cluster (Civil_61–Civil_68).
  • Starred ⭐ formulas are the most frequently tested in GATE CE — master these first.
  • Standard values (design parameters) are boxed separately for quick reference.
  • IS codes listed are the primary references for each formula/parameter.
  • GATE CE environmental engineering pattern: 2–3 BOD/COD problems + 1–2 design problems (sedimentation, filtration, or population forecasting) + 1 wastewater/sludge problem = 6–8 marks total.



1. Water Quality Parameters — Civil_61

BOD exerted at time t:

yt = L₀(1 – e–kdt)

Lt = L₀ e–kdt (BOD remaining)

yt + Lt = L₀    (always)

Base-10 form: yt = L₀(1 – 10–K₁t); kd = 2.303 K₁

BOD temperature correction:

kd,T = kd,20 × θ(T–20)    θ = 1.047

At 25°C: kd,25 = 1.261 × kd,20

At 15°C: kd,15 = 0.794 × kd,20

Dissolved oxygen:

DO deficit D = DOsat – DOactual

DOsat at 20°C = 9.1 mg/L; at 25°C = 8.26 mg/L; at 30°C = 7.54 mg/L

Streeter-Phelps DO sag curve:

Dt = [kdL₀/(kr–kd)](e–kdt – e–krt) + D₀ e–krt

Critical time: tc = [1/(kr–kd)] ln[(kr/kd)(1 – D₀(kr–kd)/(kdL₀))]

Critical deficit: Dc = (kd/kr) × L₀ × e–kdtc

Minimum DO = DOsat – Dc

Mixing equations:

DOmixed = (Qr×DOr + Qs×DOs)/(Qr+Qs)

L₀mixed = (Qr×BODr + Qs×BODs)/(Qr+Qs)

Hardness as CaCO₃:

Hardness (mg/L CaCO₃) = mg/L ion × (50 / equivalent weight of ion)

Ca²⁺: eq wt = 20; factor = 2.5;   Mg²⁺: eq wt = 12; factor = 4.17

Key IS Codes

IS 10500:2012 — Drinking water: turbidity ≤1 NTU; pH 6.5–8.5; TDS ≤500 mg/L; hardness ≤200 mg/L CaCO₃; NO₃ ≤45 mg/L; F ≤1.0 mg/L; coliform = 0/100 mL



2. Water Treatment — Civil_62

Sedimentation (CPHEEO):

Overflow rate = Q/A    [m³/m²/day]

Detention time t = V/Q

Particle removed completely if vs ≥ overflow rate

Partial removal (vs < overflow rate) = vs/overflow rate

Water treatment: overflow rate 12,000–24,000 L/m²/day; detention 2–4 hours

Stokes’ law (settling velocity):

vs = (ρs–ρw) g d² / (18μ)

Valid for Rep = ρwvsd/μ < 1 (Stokes regime)

Filtration rates:

Slow sand filter (SSF): 0.1–0.4 m/h

Rapid sand filter (RSF): 4–6 m/h = 120–150 m³/m²/day

Chlorination:

Chlorine demand = Cl₂ applied – Residual chlorine

IS 10500: Residual free chlorine = 0.2–1.0 mg/L at consumer tap

Breakpoint: Cl₂/NH₃-N ≈ 10:1 (by mass); beyond breakpoint → free residual

Softening reactions:

Ca(OH)₂ + Ca(HCO₃)₂ → 2CaCO₃↓ + 2H₂O (temporary Ca hardness)

CaSO₄ + Na₂CO₃ → CaCO₃↓ + Na₂SO₄ (permanent Ca hardness)

Lime required: Ca(OH)₂/Ca(HCO₃)₂ = 74/162 (molar ratio 1:1)



3. Water Supply Design — Civil_63

Population forecasting:

Arithmetic: Pn = P₀ + n × ΔPavg    (n = decades)

Geometric: Pn = P₀ × (1 + r/100)ⁿ    (r = % growth per decade)

Incremental: Pn = P₀ + n×ΔPavg + n(n+1)/2 × Δ²Pavg

Per capita demand (IS 1172):

Domestic: 135 LPCD (Class I cities > 1 million)

Rural (Jal Jeevan Mission norm): 55 LPCD FHTC

Sewage = 80% of water supply

Peak demand factors:

Maximum daily demand (MDD) = 1.8 × ADD

Maximum hourly demand (MHD) = 2.7 × ADD/24

Design: Treatment plant → MDD; Distribution mains → MHD

Fire demand (Kuichling):

Qf = 3182√P    (L/min; P in thousands)

Freeman: Qf = 1136.5(P/5 + 10)    (L/min; P in thousands)

Balancing storage ≈ 1/3 to 2/3 of daily demand (depends on pumping hours)



4. Sewage & Wastewater — Civil_64

Sewage quantity:

Sewage = 80% × water supply    (Indian practice)

DWF = 100–110 LPCD (for 135 LPCD water supply)

Harmon’s peak factor: Pf = 1 + 14/(4 + √P)    (P in thousands)

Peak sewage = Pf × DWF

Manning’s equation for sewer flow:

V = (1/n) R2/3 S1/2; Q = A × V

Circular sewer full: R = D/4; A = πD²/4

Half-full: Rhalf = Rfull = D/4; Vhalf = Vfull

n = 0.013 (concrete/vitrified clay)

Self-cleansing velocity ≥ 0.6–0.9 m/s

Rational formula (storm runoff):

Q = C × i × A / 360    (Q in m³/s; i in mm/hr; A in ha)



5. Wastewater Treatment — Civil_65

Treatment efficiencies:

Primary: BOD 40–60%; SS 50–70%

Secondary (ASP): BOD 85–95% total from raw sewage

Overall: Etotal = 1 – (1–E₁)(1–E₂)

BOD removal efficiency: E = (BODin–BODout)/BODin

Primary sedimentation (CPHEEO):

Overflow rate: 24,000–32,000 L/m²/day

Detention time: 1.5–2.5 hours

Secondary clarifier (ASP): 16,000–24,000 L/m²/day; 2–4 hours

Oxidation pond:

Complete mix: Ce = Ci/(1 + krt)

Plug flow: Ce = Ci × e–krt

BOD surface loading: 100–350 kg/ha/day (tropical India)

HRT: 10–30 days (facultative pond)

Sludge digestion:

Biogas: 0.03–0.05 m³/capita/day; 65–70% CH₄

Digestion period: 25–30 days (mesophilic, 30–38°C)

Digester capacity: 70–100 L/capita

Sludge drying bed: 0.1–0.2 m² per capita

IS 2490 Discharge Standards

ParameterTo Inland WaterFor Land Irrigation
pH6.0–8.56.0–10.0
BOD₅≤ 30 mg/L≤ 100 mg/L
SS≤ 100 mg/L≤ 200 mg/L



6. Activated Sludge & Trickling Filters — Civil_66

F/M ratio (Food-to-Microorganism):

F/M = Q × S₀ / (V × X) = S₀ / (X × θ)    [kg BOD/kg MLSS/day]

Conventional ASP: F/M = 0.2–0.5; MLSS = 1500–3000 mg/L; HRT = 4–8 hr

Extended aeration: F/M = 0.05–0.15; MLSS = 3000–6000 mg/L; HRT = 18–36 hr

Sludge Volume Index (SVI):

SVI = settled volume (mL/L) × 1000 / MLSS (mg/L)    [mL/g]

Good settling: SVI = 50–150 mL/g; Bulking: SVI > 150 mL/g

RAS concentration: Xr ≈ 10⁶/SVI (mg/L)

Return ratio: R = X/(Xr–X)

Sludge age (SRT):

θc = V × X / (Qw × Xw + Qe × Xe)    [days]

Conventional ASP: θc = 5–15 days

Nitrification requires θc > 10 days (at 20°C)

Oxygen requirement:

O₂ = a’ × BODremoved + b’ × MLVSS × V

a’ ≈ 0.5–0.65 kg O₂/kg BOD; b’ ≈ 0.05–0.10 kg O₂/kg MLVSS/day

NRC formula (trickling filter):

E = 1/[1 + 0.4432√(W/(VF))]    (single stage)

F = (1+R)/(1+R/10)²; W = BOD applied (kg/day); V = media volume (m³)

Two-stage: E₂ = 1/[1 + {0.4432/(1–E₁)} × √(W₂/(V₂F₂))]

Overall: Etotal = 1 – (1–E₁)(1–E₂)



7. Solid Waste Management — Civil_67

Generation rates:

Class I cities (metro): 0.45–0.60 kg/capita/day

Small towns: 0.20–0.35 kg/capita/day

India total: ~160,000 TPD

Compaction ratio and volume:

Compaction ratio (CR) = ρcompactedloose

Volume reduction % = (1 – 1/CR) × 100%

Daily volume = daily waste / compacted density

Daily total landfill volume = waste volume × (1 + cover fraction)

Landfill life = total volume / daily total volume

Composting C:N ratio:

Optimal C:N = 25–35:1

Blend C:N = Total C / Total N (weighted; not simple average)

Landfill gas (first-order model):

Q(t) = M × k × L₀ × e–kt

L₀ = ultimate CH₄ potential (m³/tonne); k = decay rate (0.02–0.10 yr⁻¹)

LFG: 50–60% CH₄; 40–50% CO₂

Leachate (simplified):

Qleachate ≈ infiltration fraction × precipitation × area

BOD of leachate: 1,000–10,000 mg/L (young landfill)



8. Air Pollution — Civil_68

Gaussian plume — ground-level centreline concentration:

C(x,0,0) = [Q/(π σy σz u)] × exp[–H²/(2σz²)]

Full Gaussian (any y, z):

C(x,y,z) = [Q/(2π σy σz u)] × exp[–y²/(2σy²)] × {exp[–(z–H)²/(2σz²)] + exp[–(z+H)²/(2σz²)]}

Cmax ∝ Q; Cmax ∝ 1/u; Cmax ∝ 1/H²

Effective stack height:

H = h + Δh (physical height + plume rise)

Holland’s plume rise: Δh = (vsd/u)[1.5 + 2.68×10⁻³ P(Ts–Ta)/Ts × d]

CPCB minimum stack height: H = 14Q0.3 (H in m; Q = SO₂ in kg/hr)

Particulate control efficiency:

η = (Cin–Cout)/Cin; P = 1–η (penetration)

Series devices: Ptotal = P₁ × P₂ × …; ηtotal = 1–Ptotal

ESP: 95–99.5%; Baghouse: 99–99.9%; Cyclone: 50–90%

FGD (wet limestone):

CaCO₃ + SO₂ + ½O₂ + 2H₂O → CaSO₄·2H₂O (gypsum) + CO₂

SO₂ removal: 90–98%

NAAQS 2009 Key Standards

PollutantAnnual (μg/m³)24-hour (μg/m³)
PM₂.₅4060
PM₁₀60100
SO₂5080
NO₂4080
CO2000 (8-hr)



9. Standard Values Quick Reference

BOD Rate Constants

kd (day⁻¹, 20°C)Typical Water/Wastewater
0.05–0.10Slightly polluted river / nitrified effluent
0.10–0.15Settled sewage (primary effluent)
0.15–0.25Raw domestic sewage
0.20–0.30Streams receiving sewage

CPHEEO Water Treatment Design Values

Unit OperationDesign ParameterValue
Sedimentation (water)Overflow rate12,000–24,000 L/m²/day
Sedimentation (water)Detention time2–4 hours
Primary sewage clarifierOverflow rate24,000–32,000 L/m²/day
Primary sewage clarifierDetention time1.5–2.5 hours
Secondary clarifier (ASP)Overflow rate16,000–24,000 L/m²/day
Rapid sand filterFiltration rate4–6 m/h (120–150 m³/m²/day)
Slow sand filterFiltration rate0.1–0.4 m/h

Activated Sludge Process — Design Values

ProcessF/MMLSS (mg/L)HRT (hr)SRT (days)
Conventional0.2–0.51500–30004–85–15
Extended aeration0.05–0.153000–600018–3620–30

GATE CE Priority Formula Ranking — Environmental Engineering

RankFormula / ConceptTypical Marks
1BOD kinetics: yt = L₀(1–e–kdt); kd temperature correction1–2
2Population forecasting (arithmetic, geometric, incremental)1–2
3Sedimentation: overflow rate = Q/A; detention time = V/Q1
4DO sag curve: Streeter-Phelps equation; critical deficit1
5Overall BOD removal: Etotal = 1–(1–E₁)(1–E₂)1
6F/M ratio; aeration tank volume; NRC trickling filter formula0–1
7Landfill life; compaction ratio; landfill gas Q(t) = MkL₀e–kt0–1
8Gaussian dispersion; NAAQS values; AQI interpretation0–1